Project Description: |
DISTRICT 6- INSTALLATION & REFURBISHMENT OF CRASH CUSHION SYSTEMS AT VARIOUS LOCATIONS
Work will be assigned, as needed, throughout the life of the contract.
|
Location: |
|
Design Responsibility: | In-House Boston |
Project Manager: | John Gendall![]() |
Estimated Total Contract Cost: | $408,669.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|