Project Description: |
NEW BEDFORD- RECONSTRUCTION OF ROUTE 18 (JFK HIGHWAY), FROM COVE STREET TO GRIFFIN COURT (PHASE II)
Work on the reconstruction of Route 18 project consists of roadway resurfacing and reconstruction, traffic signal installation, sidewalk and bike path installation on a section of Route 18 (JFK Highway) south of the downtown section ending at Cove Street. New signs and pavement markings are included in the .95 mile long project.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Kimberley Sloan![]() |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|