Project Description:
FITCHBURG- LUNENBURG- LEOMINSTER- RECONSTRUCTION OF SUMMER STREET AND NORTH STREET
The project involves full depth reconstruction on Summer Street in Lunenburg and Fitchburg and cold plane and overlay of North Street in Leominster. The proposed cross-section involves reducing the roadway pavement width to 12 foot travel lanes with 8 foot shoulders. A sidewalk is proposed along both sides of roadway and a closed drainage system will be installed from the Leominster/Lunenburg town line to John Fitch Highway. Minor gateway landscaping at the Leominster/Lunenburg town line to differentiate the residential area of North Road from the more industrial area of Summer Street is proposed. The intersections of Summer Street and Graham Street, Summer Street and Whalom Road and Summer Street with Youngs Road will be realigned to improve intersection sight distance and to facilitate vehicle turning movements. Granite curbing and guardrail will be installed along the project corridor, as well as pavement markings and signage.
Location:
  • City of Fitchburg
  • City of Leominster
  • Town of Lunenburg
  • Construction Begins: Spring 2018
    Resident Engineer: Ryan Davison
    Construction Bid Price: $7,105,195.90
    District: District 3

    Contracts (1) Progress
    # 101985 -- Construction Contract
    Roadway Reconstruction and Related Work (Including Signals) along Sections of Summer and North Streets. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 04/25/2018
    Contract Information
    Project Designer: Municipality
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/05/2010
    Project Initiation Form PIF Entered 04/05/2010
    Project Initiation Form PRC Submitted 04/05/2010
    Project Review Committee PRC Approved 05/13/2010
    Project Status Advertised 08/19/2017
    Project Management
    100% Design 100% Package Received 12/09/2016
    100% Design 100% Package Comments to DE 02/03/2017
    25% Design 25% Package Received 01/21/2014
    25% Design 25% Package Comments to DE 12/23/2014
    25% Design Design Public Hearing 07/22/2015
    75% Design 75% Package Received 04/12/2016
    75% Design 75% Package Comments to DE 08/18/2016
    Final Design PS&E Received 05/01/2017
    Final Design PS&E Received - Resub 1 05/31/2017