Project Description:
MIDDLETON- RESURFACING & RELATED WORK ON ROUTE 114
The work to be done under this Contract shall consist of asphalt resurfacing and general maintenance work on three locations of State Route 114 in the town of Middleton. Projecet limits are from MM 7.96 to MM 12.15. The length of project is 17,499 feet or 3.31 miles. The entire roadway shall be coldplaned, and in specific areas of severe deterioration the roadway will be reconstructed. All catch basins grates will be replaced with locking structures and all remaining castings will be repaired if necessary and adjusted to the proposed final grade. The final roadway resurfacing will consist of a 1.75” layer of modified top. All guardrail will be retrofitted with composite offset blocks and repairs shall be made where required. All guardrail trailing ends are to be upgraded to current standards where necessary. Eroded shoulders are to be reshaped with dense graded gravel. Pavement markings and traffic loop detectors are to be restored to their existing orientation and specifications. Bridge M-20-10, which carries Rte 114 over Emerson Brook, shall receive maintenance treatment in the way of bridge curb repairs, hot mix asphalt sidewalk resurfacing, deck resurfacing and bridge rail painting.
Location:
  • Town of Middleton
  • Resident Engineer: Anthony Lapensee
    Construction Contract Value: $1,781,191.00
    Construction Bid Price: $1,547,746.25
    Initial Construction Estimate: $1,712,426.50
    District: District 4

    Contracts (1) Progress
    # 76735 -- Construction Contract
    Resurfacing and Related Work along Sections of Route 114 (North and South Main Streets). Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 06/17/2013
    Contract Information
    Project Designer: In-House Boston
    Funding Source: NATIONAL HIGHWAY SYSTEM
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 04/06/2010
    Project Initiation Form PIF Entered 06/08/2010
    Project Initiation Form PRC Submitted 08/22/2011
    Project Review Committee PRC Approved 08/11/2011
    Project Review Committee Letter 08/22/2011
    Project Status Advertised 02/23/2013
    Project Management
    100% Design 100% Package Received 01/25/2013
    75% Design 75% Package Received 07/19/2012
    75% Design 75% Package Comments to DE 09/17/2012
    Final Design PS&E Received 02/19/2013
    Final Design PS&E to FAPRO 02/19/2013