Project Description:
|
MIDDLETON- RESURFACING & RELATED WORK ON ROUTE 114
The work to be done under this Contract shall consist of asphalt resurfacing and general maintenance work on three locations of State Route 114 in the town of Middleton. Projecet limits are from MM 7.96 to MM 12.15. The length of project is 17,499 feet or 3.31 miles.
The entire roadway shall be coldplaned, and in specific areas of severe deterioration the roadway will be reconstructed. All catch basins grates will be replaced with locking structures and all remaining castings will be repaired if necessary and adjusted to the proposed final grade. The final roadway resurfacing will consist of a 1.75” layer of modified top.
All guardrail will be retrofitted with composite offset blocks and repairs shall be made where required. All guardrail trailing ends are to be upgraded to current standards where necessary. Eroded shoulders are to be reshaped with dense graded gravel.
Pavement markings and traffic loop detectors are to be restored to their existing orientation and specifications.
Bridge M-20-10, which carries Rte 114 over Emerson Brook, shall receive maintenance treatment in the way of bridge curb repairs, hot mix asphalt sidewalk resurfacing, deck resurfacing and bridge rail painting.
|