CANTON- NORWOOD- WESTWOOD- DEDHAM STREET/I-95 INTERCHANGE RECONSTRUCTION INCLUDING REHABILITATION/REPLACEMENT OF 5 BRIDGES
The Canton Street/Dedham Street project consists of the construction of an off-ramp from I-95 northbound to Dedham Street and improvements to the Dedham Street/Canton Street corridor. Within the approximately 4,000 linear feet between Kirby Drive and University Ave, the existing two lane Dedham Street/Canton St will be widened to provide two 11.5 foot travel lanes in each direction, 5 foot shoulders in each direction, and a 6 foot wide sidewalk will be constructed on the northern side of Dedham Street/Canton St, from Kirby Drive to the Canton St/University Ave intersection. This roadway reconstruction will require the bridges over AMTRAK and the Neponset River to be widened and the bridge over I-95 to be replaced. Traffic signal control will be installed at three locations: Dedham Street at the I-95 southbound on-ramp; Dedham Street at the proposed I-95 northbound off-ramp; and the Dedham Street/Shawmut Road intersection. These three intersections will operate as a coordinated signal system and will provide safe pedestrian crossing locations for the major potential sources of pedestrian trips.
Location:
  • Town of Canton
  • Town of Norwood
  • Town of Westwood
  • Resident Engineer: Roderick Connelly III
    Construction Bid Price: $44,265,035.70
    District: District 6

    Contracts (6) Progress
    # 54837 -- Design -- Bridge Rehab/Recon/New Const
    Work will consist of structural evaluations and emergency design support services to support the Bridge Preservation/Betterment Advertisement Program. Final
    # 64308 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 64321 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassDOT on a task order basis for various statewide highway and bridge projects. Final
    # 77846 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 80640 -- Non-system contract type
    Statewide - Owner's Representative will perform peer reviews and manage cost recovery and value engineering for various projects
    # 90726 -- Construction Contract
    Dedham Street/ I-95 Interchange Reconstruction Including Rehabilitation/Replacement of 5 Bridges.

    Bridges

    Contract Dates
    Notice to Proceed: 12/22/2016
    Contract Information
    Project Designer: Consultant
    Funding Source: Interstate Maintenance
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 05/10/2010
    Project Initiation Form PIF Entered 07/29/2011
    Project Initiation Form PRC Submitted 05/11/2010
    Project Review Committee PRC Approved 05/13/2010
    Project Review Committee Letter 06/09/2010
    Project Status Advertised 09/19/2015
    Project Management
    100% Design 100% Package Received 12/23/2014
    100% Design 100% Package Comments to DE 04/27/2015
    25% Design 25% Package Received 03/01/2010
    25% Design 25% Package Comments to DE 06/24/2010
    25% Design 25% Package Comments to DE 06/24/2010
    25% Design 25% Package Comments to DE 06/24/2010
    25% Design Design Public Hearing 08/27/2014
    75% Design 75% Package Received 03/21/2011
    75% Design 75% Package Received 03/04/2014
    75% Design 75% Package Comments to DE 08/02/2014
    Final Design PS&E Received 07/31/2015
    Final Design PS&E Received 05/27/2016
    Final Design PS&E to Peer Reviewer 07/31/2015
    Final Design Peer Review Comments to DE 08/26/2015
    Final Design PS&E to FAPRO 09/01/2015