Project Description: |
BOURNE- RESURFACING & RELATED WORK ON ROUTE 28
Work on this project includes roadway resurfacing (mill and overlay) of the existing roadway. Drainage improvements, bridge work, safety improvements and associated work will also be included in this contract. The project extends along Route 28 from the South side of the Bourne Bridge to the Bourne/Falmouth Town Line (MM 56.5 to MM 63) for a total project length of 6.5 miles.
|
Location: |
|
Resident Engineer: | Malcolm Lavalley |
Construction Contract Value: | $8,520,667.84 |
Construction Bid Price: | $7,389,353.40 |
Initial Construction Estimate: | $6,712,000.00 |
District: | District 5 |
|