| Project Description: |
BOSTON- NEWTON- WESTON- SUBSTRUCTURE REPAIRS TO 9 BRIDGES ON THE METROPOLITAN HIGHWAY SYSTEM (MHS)
The project will consist of removal of deteriorated reinforced concrete from the substructure elements of 9 bridges and adjacent retaining walls - and replacement with new concrete.
|
| Location: |
|
| Resident Engineer: | Paul Brennan![]() |
| Construction Contract Value: | $2,874,298.00 |
| Construction Bid Price: | $2,334,172.60 |
| Initial Construction Estimate: | $4,906,770.64 |
| District: | District 6 |
|