Project Description: |
BLACKSTONE- PAINTING OF PEDESTRIAN BRIDGES ALONG THE BLACKSTONE VALLEY GREENWAY SEGMENT 1 (DCR P10-2636-D1A AND P11-2701-C1A)
Work consists of painting the pedestrian bridges on the Blackstone Valley Bike Path.
|
Location: |
|
Project Manager: | Victoria Sheehan |
Estimated Total Federal Participating Construction Cost: | N/A |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|