| Project Description: |
BOSTON- PEDESTRIAN BRIDGE REHABILITATION OF WALTER BAKER OVER THE NEPONSET RIVER (DCR P10-2631-C2A)
Work consists of repairing/rehabilitating the Walter Baker Pedestrian Bridge.
|
| Location: |
|
| Project Manager: | Victoria Sheehan![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||