| Project Description: |
WORCESTER- MARLBOROUGH- GUIDE & TRAFFIC SIGN REPLACEMENT & RELATED WORK AT I-290 & ROUTE 85 CONNECTOR
This project is for the replacement and updating of guide and traffic signs on Interstate 290, including applicable signs on intersecting secondary roads, from Plantation Street (Exit 21) in Worcester to Interstate 495 (Exit 26) in Marlborough, and the Route 85 connector between Interstate 290 and Route 85 in Marlborough.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Stephen Timmins![]() |
| Estimated Total Contract Cost: | $2,799,373.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|