| Project Description: |
ATHOL- RESURFACING & RELATED WORK ON ROUTE 32, FROM ROUTE 2 TO ROUTE 2A
Work for this project will consist of milling the existing paved surface and resurfacing with hot mix asphalt pavement course modified top on Route 32 from the Route 2/202 interchange to Route 2A. Work will also include replacing existing sidewalk, replacing signs and guardrail as needed, repairing hot mix asphalt berm, and new pavement markings.
|
| Location: |
|
| Resident Engineer: | William Whiteman![]() |
| Construction Contract Value: | $783,903.00 |
| Construction Bid Price: | $695,142.10 |
| Initial Construction Estimate: | $738,173.00 |
| District: | District 2 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||