Project Description: |
TAUNTON- LAKEVILLE- CABLE BARRIER INSTALLATION ON ROUTE 140
Installation of a median safety barrier between Exits 9 and 12 for a length of 6.4 miles.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | Erica Summers![]() |
Estimated Total Contract Cost: | $1,074,510.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|