Project Description: |
FALL RIVER- SOMERSET- SURVEILLANCE SYSTEM INSTALLATION ON BRAGA BRIDGE (I-195)
This grant money will fund a surveillance system for the Braga Bridge. The preliminary design included in the grant proposal consists of traffic and security surveillance through the use of cameras, 6 in total (4 below and 2 above). Video from the cameras to be transmitted to highway operations center in South Boston.
|
Location: |
|
Resident Engineer: | Cassandra Asvestas |
Construction Contract Value: | $450,241.05 |
Construction Bid Price: | $387,027.00 |
Initial Construction Estimate: | $236,696.06 |
District: | District 5 |
|
Bridges |
|
|
|
|