| Project Description: | 
 FALL RIVER- SOMERSET- SURVEILLANCE SYSTEM INSTALLATION ON BRAGA BRIDGE (I-195) 
This grant money will fund a surveillance system for the Braga Bridge.  The preliminary design included in the grant proposal consists of traffic and security surveillance through the use of cameras, 6 in total (4 below and 2 above).  Video from the cameras to be transmitted to highway operations center in South Boston. 
 | 
| Location: | 
 | 
| Resident Engineer: | Cassandra Asvestas![]()  | 
| Construction Contract Value: | $450,241.05 | 
| Construction Bid Price: | $387,027.00 | 
| Initial Construction Estimate: | $236,696.06 | 
| District: | District 5 | 
  | 
Bridges | 
||||||||
  | 
||||||||||
  | 
  | 
 
 
  | 
||||||||||||||||||||||||||||||||||||||