Project Description:
DUNSTABLE- BRIDGE REPLACEMENT, D-13-001, MAIN STREET OVER SALMON BROOK
The proposed replacement structure will be a 25’6” long single span reinforced concrete slab with 3” HWA wearing surface supported by integral abutments with H-piles. The proposed superstructure will have an out-to-out width of 30’10” and a roadway width of 28’. The bridge profile is expected to remain approximately the same.
Location:
  • Town of Dunstable
  • Resident Engineer: Stephanie Jahnle
    Construction Contract Value: $1,287,122.00
    Construction Bid Price: $1,097,063.00
    Initial Construction Estimate: $1,136,851.50
    District: District 3

    Contracts (2) Progress
    # 68939 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design services to MassDOT on a task order basis for Layout and Right of Way assignments. Final
    # 81676 -- Construction Contract
    Bridge Replacement (D-13-001) (Concrete) - Main Street over Salmon Brook. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 06/05/2014
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 10/19/2010
    Project Initiation Form PIF Entered 10/26/2013
    Project Initiation Form PRC Submitted 10/19/2010
    Project Review Committee PRC Approved 11/18/2010
    Project Review Committee Letter 11/24/2010
    Project Status Advertised 04/12/2014
    Project Management
    100% Design 100% Package Received 02/03/2014
    25% Design 25% Package Received 10/21/2013
    25% Design 25% Package Comments to DE 01/09/2014
    25% Design 25% Package Approved 01/17/2014
    25% Design Design Public Hearing 12/04/2013
    75% Design 75% Package Received 02/03/2014
    Final Design PS&E Received 03/26/2014
    Final Design PS&E to FAPRO 04/08/2014