| Project Description: |
DUNSTABLE- BRIDGE REPLACEMENT, D-13-001, MAIN STREET OVER SALMON BROOK
The proposed replacement structure will be a 25’6” long single span reinforced concrete slab with 3” HWA wearing surface supported by integral abutments with H-piles. The proposed superstructure will have an out-to-out width of 30’10” and a roadway width of 28’. The bridge profile is expected to remain approximately the same.
|
| Location: |
|
| Resident Engineer: | Stephanie Jahnle![]() |
| Construction Contract Value: | $1,287,122.00 |
| Construction Bid Price: | $1,097,063.00 |
| Initial Construction Estimate: | $1,136,851.50 |
| District: | District 3 |
|