| Project Description: |
WORCESTER- SUPERSTRUCTURE REPLACEMENT, W-44-030, PLANTATION STREET OVER CSX RAILROAD
The proposed project is an agreed upon mitigation for the projected traffic impacts of the CSX Terminal expansion in Worcester. The superstructure and south abutment will be replaced. The new bridge will accommodate two travel lanes, a turning lane, two bicycle lanes and two sidewalks.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Matt Hopkinson![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 3 |
| Current Status: | This project is in the preliminary design phase. |
|