WAREHAM- CULVERT AND DAM REPLACEMENT ON CRANBERRY HIGHWAY AT ROUTE 28 AND ROUTE 6, MILL POND DAM OVER AGAWAM RIVER
The purpose of this project involves the construction of the bridge carrying U.S. Route 6 westbound and State Route 28 northbound, also known as Cranberry Highway, over Agawam River, construction of a new spillway, construction of a new fish ladder, reconstruction of the existing upstream fishway, and reconstruction of the embankments of Mill Pond Dam. The work includes the demolition of the existing primary and secondary spillways, existing fish ladder, storage shed, and removal trees and brush from the embankments of the dam and dike. The work shall include realignment and improvements to the roadway and sidewalk at the approach and across the proposed structure, including a buffered bicycle lane, stormwater treatment, and landscape enhancements.
Location:
  • Town of Wareham
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Harry Adolphe
    Estimated Total Federal Participating Construction Cost: N/A
    Funding Provision: This project is planned to be funded through the 2026 Transportation Improvement Program for the Southeastern Massachusetts Metropolitan Planning Organization.
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • W06020 
    See the Milestone Details tab for additional Project information
    Planned Federal FY: 2026
    Responsible MPO: Southeastern Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: WAREHAM
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (PROTECT)
    Federal Cost: $9,639,666.40
    State Cost: $2,409,916.60
    Total Cost: $12,049,583.00

    Planned Federal FY: 2027
    Responsible MPO: Southeastern Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: WAREHAM
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (PROTECT)
    Federal Cost: $9,527,248.80
    State Cost: $2,381,812.20
    Total Cost: $11,909,061.00

    Planned Federal FY: 2028
    Responsible MPO: Southeastern Massachusetts Metropolitan Planning Organization
    Location: Municipality
    Cities: WAREHAM
    Category: Advertised Projects Constr.
    Budget Section: 2A
    Advance Construct: No
    Air Quality Exempt: No

    No comments for this TIP line
    Category FA - Promoting Resilient Operations for Transformative, Efficient, and Cost-saving Transportation (PROTECT)
    Federal Cost: $4,800,000.00
    State Cost: $1,200,000.00
    Total Cost: $6,000,000.00