Project Description: |
BEDFORD- BILLERICA- CHELMSFORD- CABLE BARRIER INSTALLATION ON ROUTE 3
A Road Side Safety Audit (RSA) has identified this location as a high risk for median cross-over accidents. The study section (approx. 8.5 miles) identified 6.1 miles of open median. Cable barrier is recommended and will be installed between Exits 26 and 29.
|
Location: |
|
Resident Engineer: | Stephen Doherty |
Construction Contract Value: | $1,096,021.00 |
Construction Bid Price: | $922,564.65 |
Initial Construction Estimate: | $1,000,625.00 |
District: | District 4 |
|
Bridges |
|
|
|
|