| Project Description: |
WAREHAM- BRIDGE REPLACEMENT, W-06-002, PAPER MILL ROAD OVER WEWEANTIC RIVER
The work on this project will consist of the full replacement of Paper Mill Road over the Weweantic River in the Town of Wareham. This will include replacement of the existing structure with an anticipated detour for full closure of the bridge. The proposed bridge will consist of a precast concrete arch, a new wearing surface, painted steel bridge rail, and limited approach roadway work.
|
| Location: |
|
| Project Manager: | Violet Wilkins![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||