DIGHTON- BRIDGE REPLACEMENT, D-08-006, BROOK STREET OVER SEGREGANSET RIVER
The work on this project will consist of the full replacement of Bridge D-08-006 on Brook Street over Segreganset River in the Town of Dighton. This will include replacement of the existing structure with an anticipated detour for full closure of the bridge. The proposed bridge will consist of a precast concrete arch, a new wearing surface, painted steel bridge rail, and limited approach roadway work.
Location:
  • Town of Dighton
  • Resident Engineer: Amy Aveiro
    Construction Contract Value: $1,227,601.00
    Construction Bid Price: $1,095,819.50
    Initial Construction Estimate: $1,033,068.00
    District: District 5

    Contracts (3) Progress
    # 58213 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design and review services to MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 68940 -- Design -- Hwy Eng Open End
    Work will consist of providing engineering design services to MassDOT on a task order basis for Layout and Right of Way assignments. Final
    # 79294 -- Construction Contract
    Bridge Replacement (D-08-006) (Concrete) Brook Street over Segreganset River. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 12/11/2013
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/23/2010
    Project Initiation Form PIF Entered 11/23/2010
    Project Initiation Form PRC Submitted 02/01/2011
    Project Review Committee PRC Approved 02/10/2011
    Project Status Advertised 08/17/2013
    Project Management
    100% Design 100% Package Received 05/15/2013
    25% Design 25% Package Received 07/17/2012
    25% Design 25% Package Comments to DE 09/21/2012
    25% Design Design Public Hearing 12/04/2012
    75% Design 75% Package Received 02/01/2013
    75% Design 75% Package Comments to DE 04/02/2013
    Final Design PS&E Received 07/26/2013
    Final Design PS&E to FAPRO 08/14/2013