CAMBRIDGE- ARLINGTON- BELMONT- LEXINGTON- HIGHWAY LIGHTING REPAIR & MAINTENANCE ON ROUTE 2
The Route 2 Highway Lighting System has reached the end of its useful life. The lighting system requires constant maintenance, with some areas being beyond repair.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Ranjit Sivasubramaniam![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 4 |
| Current Status: | This project is in the preliminary design phase. |
|