Enter a City or Road name to search for a new project:
Advanced Project Search
Project Description:
CAMBRIDGE- ARLINGTON- BELMONT- LEXINGTON- HIGHWAY LIGHTING REPAIR & MAINTENANCE ON ROUTE 2
The Route 2 Highway Lighting System has reached the end of its useful life. The lighting system requires constant maintenance, with some areas being beyond repair.
Location:
  • Town of Arlington
  • Town of Belmont
  • Construction Begins: Spring 2019
    Resident Engineer: Brian Polley
    Construction Bid Price: $14,762,000.00
    District: District 4
    Current Status: Overall Cleanup of project, connect power to newly installed CCTV cameras and test cameras. Punch list items to be addressed. (as of 01/10/2024)

    Contracts (3) Progress
    # 105765 -- Construction Contract
    Highway Lighting Improvements and Related Work along a Section of Route 2 (Concord Turnpike) 99% Complete
    # 51301 -- Design -- Hwy Eng Open End
    Statewide - work will consist of providing engineering design and review services to the MassHighway on an open end basis for various statewide highway and bridge projects. Final
    # 72436 -- Design -- Traffic Signing/Signals
    Work will consist of providing engineering services in connection with the design and modifications to the statewide highway lighting system. Final

    Bridges

    Contract Dates
    Notice to Proceed: 06/05/2019
    Contract Information
    Project Designer: Consultant
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    Current Status
    Overall Cleanup of project, connect power to newly installed CCTV cameras and test cameras. Punch list items to be addressed.
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 12/24/2010
    Project Initiation Form PIF Entered 12/24/2010
    Project Initiation Form PRC Submitted 04/01/2011
    Project Review Committee PRC Approved 05/19/2011
    Project Status Advertised 09/01/2018
    Project Management
    100% Design 100% Package Received 05/04/2018
    25% Design 25% Package Received 12/09/2014
    75% Design 75% Package Received 12/06/2017
    75% Design 75% Package Comments to DE 01/23/2018
    75% Design 75% Package Comments to DE 01/25/2018
    Final Design PS&E Received 08/17/2018
    Final Design PS&E to FAPRO 08/17/2018