Project Description:
RAYNHAM- BRIDGE DECK REPLACEMENT, R-02-025, ROUTE 138 OVER I-495
The purpose of this project is to replace the bridge deck on the Route 138 bridge structure over I-495. It is anticipated that the wearing surface and waterproof membrane will be removed, the deck will be patched and a new waterproof membrane and bituminous concrete wearing surface will be put in place. The bridge repair work will be constructed using staged construction procedures. A traffic management plan is required. Utilities in the area shall be maintained.
Location:
  • Town of Raynham
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Harry Adolphe
    Estimated Total Contract Cost: $6,653,779.60
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 5
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • R02025 
    See the Milestone Details tab for additional Project information
    No TIP Data Available For This Project