RAYNHAM- BRIDGE DECK REPLACEMENT, R-02-025, ROUTE 138 OVER I-495
The purpose of this project is to replace the bridge deck on the Route 138 bridge structure over I-495. It is anticipated that the wearing surface and waterproof membrane will be removed, the deck will be patched and a new waterproof membrane and bituminous concrete wearing surface will be put in place. The bridge repair work will be constructed using staged construction procedures. A traffic management plan is required. Utilities in the area shall be maintained.
|