Project Description: |
FALL RIVER- SUPERSTRUCTURE REPLACEMENT, F-02-052, HERMAN STREET OVER ROUTE 79
The purpose of this project is to replace the superstructure of the bridge carrying Herman Street over SR 79 with a two span steel stringer, and concrete deck structure. Precast bridge units are anticipated in order to facilitate construction.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Stephen Soma![]() |
Estimated Total Contract Cost: | $2,718,096.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 5 |
Current Status: | This project is in the preliminary design phase. |
|