Project Description:
FALL RIVER- CONSTRUCTION OF A TYPE II NOISE BARRIER
The proposed project will involve the construction of a Type II noise barrier along the westbound side of Interstate195 (I-195) in Fall River for the purpose of alleviating the traffic noise impacts to the qualifying existing residential homes adjacent to this location. A feasibility study was conducted in 2006 to identify potential alternatives. A preferred alternative was chosen based on providing noise relief, constructing the facility and minimizing resource impacts to the maximum extent practicable. The proposed barrier is approximately 2,800 feet in length with a height ranging from 8 feet to 25 feet above existing ground. The barrier will be a post and panel system mounted on concrete footing or rock anchored, depending upon the terrain. The barrier west of the Route 6 overpass will be constructed approximately at a 12 foot offset from the edge of pavement along the existing roadway sideslope. The barrier east of Route 6 will be constructed at approximately a 5 foot offset from the State Highway Layout Line at the top of slope. The proposed work will also include the replacement of the existing guardrail.
Location:
  • City of Fall River
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: James Cerbone
    Estimated Total Contract Cost: $5,972,142.00
    Estimated Total Federal Participating Construction Cost: $6,248,603.00
    District: District 5
    Current Status: 25% Package Received (as of 04/01/2011 )

    Contracts (3) Progress
    # 77859 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 77861 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 77864 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final

    Bridges

  • - none -
  • See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 01/10/2011
    Project Initiation Form PIF Entered 03/03/2011
    Project Initiation Form PRC Submitted 03/10/2011
    Project Review Committee PRC Approved 05/19/2011
    Project Management
    25% Design 25% Package Received 04/01/2011