Project Description: |
NANTUCKET- MULTI-USE PATH CONSTRUCTION, FROM WASHINGTON STREET TO ORANGE STREET
Work on this project consists of constructing a shared use path from Washington Street to Orange Street, primarily along the abandoned railroad bed. Work on the connecting streets is proposed to improve accommodation for non-motorized use.
|
Location: |
|
Construction Begins: | Autumn 2016 |
Resident Engineer: | Malcolm Lavalley![]() |
Construction Bid Price: | $2,440,770.00 |
District: | District 5 |
|
Bridges |
|
|
|
|