| Project Description: |
DISTRICT 4- CONSTRUCTION OF FABRIC SALT STORAGE SHEDS AT VARIOUS LOCATIONS
The proposed project is to replace two existing Chemical Storage Sheds that collapsed due to high snow loads. The failed structures are to be replaced with new Pre-engineered Modular Fabric Structures.
|
| Location: | |
| Resident Engineer: | Scott Venuti![]() |
| Construction Contract Value: | $1,846,693.00 |
| Construction Bid Price: | $1,619,443.00 |
| Initial Construction Estimate: | $1,515,000.00 |
| District: | District 4 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
|||||||||||||||||||||||||||||||||||