BUCKLAND- BRIDGE REPLACEMENT, B-28-002, ROUTE 112 (ASHFIELD ROAD) OVER CLARKS BROOK
(Replaces original #603280) The existing structure will be replaced in two stages with a bridge of the same width. Traffic will be maintained by alternating one lane traffic. A new sidewalk on the north side will be provided. Minimal approach roadway work will be performed so that the roadway width matches the bridge width. Additional improvements include new pavement markings and new signage.
Location:
  • Town of Buckland
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Albert Miller
    Estimated Total Contract Cost: $1,654,306.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 1
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • B28002 
    See the Milestone Details tab for additional Project information