Project Description: |
EAST BROOKFIELD- SPENCER- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 49
This project goes from Route 20 in Sturbridge north to Route 9 in Spencer. Hot In Place Scarification will be used to rehabilitate the travel lanes plus one foot on either side of the travel lanes. Following that, a thin lift chip seal will be applied to the entire roadway surface.
|
Location: |
|
Resident Engineer: | Stanley Choinski |
Construction Contract Value: | $2,443,442.00 |
Construction Bid Price: | $2,145,268.60 |
Initial Construction Estimate: | $2,276,667.00 |
District: | District 3 |
|
Bridges |
|
|
|
|