| Project Description: |
EAST BROOKFIELD- SPENCER- STURBRIDGE- RESURFACING & RELATED WORK ON ROUTE 49
This project goes from Route 20 in Sturbridge north to Route 9 in Spencer. Hot In Place Scarification will be used to rehabilitate the travel lanes plus one foot on either side of the travel lanes. Following that, a thin lift chip seal will be applied to the entire roadway surface.
|
| Location: |
|
| Resident Engineer: | Stanley Choinski![]() |
| Construction Contract Value: | $2,443,442.00 |
| Construction Bid Price: | $2,145,268.60 |
| Initial Construction Estimate: | $2,276,667.00 |
| District: | District 3 |
|