| Project Description: |
BOSTON- STRUCTURES MAINTENANCE, (B-16-462, B-16-457) STORROW DRIVE WEST BOUND OVER STORROW DRIVE EAST BOUND (PHASE II) (DCR P93-1671-D1A)
|
| Location: |
|
| Project Manager: | Victoria Sheehan![]() |
| Estimated Total Contract Cost: | $1,150,000.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||||||||||||||||||||