Project Description: |
BOSTON- VENT BUILDING BRICK VENEER WALL REPLACEMENT AT THE SUMNER TUNNEL (STUDY)
Currently a study to look at the need to replace the brick veneer wall at the Sumner Tunnel.
|
Location: |
|
Design Responsibility: | In-House Boston |
Right of Way Responsibility: | MassDOT |
Project Manager: | |
Estimated Total Contract Cost: | $16,100,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges |
|
|
|