Project Description: |
SOMERVILLE- MEDFORD- GREEN LINE EXTENSION INCLUDING WORK ON 5 BRIDGES: S-17-007 (MEDFORD ST), S-17-008 (SCHOOL ST), S-17-011 (LOWELL ST), S-17-013 (BROADWAY), AND MEDFORD M-12-012 (COLLEGE AVE)
As part of the Greenline Extension Project, MBTA is replacing Medford Street, Lowell Street, Broadway, College Ave and School Street over the MBTA rail corridor.
|
Location: |
|
Design Responsibility: | Other |
Project Manager: | Matt Hopkinson |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 4 |
Current Status: | 75% Package Received (as of 02/24/2014 ) |
|