Project Description:
CHARLEMONT- ROADWAY RECONSTRUCTION AND VILLAGE CENTER TRAFFIC CALMING ON ROUTE 2, FROM MM 29.5 TO MM 31.0
This 1.5 mile highway reconstruction project begins 1500 feet west of Route 8A south and ends 2600 feet east of Route 8A north. The project includes roadway and sidewalk reconstruction; drainage system and culvert repairs (including Rice Brook culvert, C-05-18); and construction of various traffic calming measures in the Charlemont village center. The town has requested that new sidewalk be constructed on the north side of Route 2 from Riddell Road to Zoar Outdoor (0.5 miles). MassDOT is currently determining the feasibility of constructing this sidewalk. In addition, all existing sidewalks and curb-cut ramps will be reconstructed to achieve PROWAG compliance. Proposed traffic calming measures will likely include sidewalk and crosswalk enhancements, "gateway" areas at the village center approaches, and improved signage and landscaping.
Location:
  • Town of Charlemont
  • Construction Begins: Winter 2019/2020
    Resident Engineer: John Bedard
    Construction Bid Price: $5,692,738.61
    District: District 1

    Contracts (1) Progress
    # 109467 -- Construction Contract
    Roadway Reconstruction and Related Work on a Section of Route 2 (Mohawk Trail) Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 01/17/2020
    Contract Information
    Project Designer: In-House Boston
    Funding Source: FED. AID. ACCELERATED BRIDGE
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 07/08/2011
    Project Initiation Form PIF Entered 07/08/2011
    Project Initiation Form PRC Submitted 08/02/2011
    Project Review Committee PRC Approved 08/11/2011
    Project Status Advertised 08/24/2019
    Project Management
    100% Design 100% Package Received 12/21/2018
    25% Design 25% Package Received 05/05/2015
    25% Design 25% Package Comments to DE 06/10/2015
    25% Design Design Public Hearing 10/25/2016
    75% Design 75% Package Received 08/03/2018
    75% Design 75% Package Comments to DE 09/12/2018
    Final Design PS&E Received 06/17/2019
    Final Design PS&E to FAPRO 08/08/2019