Project Description: |
WELLESLEY- DRAINAGE IMPROVEMENTS ALONG ROUTE 9 BOULDER BROOK CULVERT (DESIGN ONLY)
Project is for design only where work will reduce instances of flooding in the neighborhood located adjacent to Boulder Brook and Morses Pond. Issues date back to 1980s and was an active project #125298 1995-2002. Hazardous materials needed to be dealt with prior the advancement of the project.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Gautam Sen |
Estimated Total Contract Cost: | $1,890,149.03 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | 25% Package Comments to DE (as of 06/10/2015 ) |
|