| Project Description: |
DISTRICT 4- BRIDGE CLEANING & RELATED WORK AT VARIOUS LOCATIONS
The work in this project consists of the cleaning and flushing of scuppers, troughs, down spouts, drain inlets and catch basins, and flushing of concrete bridge seats, steel bearing assemblies etc., which are a part of the drainage system of various bridges and viaduct.
|
| Location: | |
| Resident Engineer: | Thomas Zizza![]() |
| Construction Contract Value: | $202,550.00 |
| Construction Bid Price: | $162,550.00 |
| Initial Construction Estimate: | $210,700.00 |
| District: | District 4 |
|