CHICOPEE- WEST SPRINGFIELD- BRIDGE PRESERVATION, C-13-023=W-21-022, I-90 OVER THE CONNECTICUT RIVER
Project consists of bridge joint repairs, new waterproofing membrane and resurfacing.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Alwin Ramirez![]() |
| Estimated Total Contract Cost: | $5,050,708.18 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|