Project Description:
CHARLEMONT- SAVOY- EMERGENCY ROADWAY STABILIZATION ON ROUTE 2 FROM MM 23.5 (F-05-005) TO MM 27.4 (C-05-024 RR BRIDGE)
This emergency repair contract consists of removing landslide debris (trees, rocks, earth, vehicles, etc.) that is on the roadway; and removing additional material from the slope at landslide locations to stabilize these areas and prevent additional material from sliding onto the roadway. The project also includes rip-rap revetment for slope stabilization. Sub-base repair will consist of geotextile placement where needed, replacing granular base material that was washed away, and reconstructing roadway pavement, as required. The project will also replace traffic lines/signs as needed for normal traffic operation. The goal is to get the roadway open to traffic by December 1, 2011.
Location:
  • Town of Charlemont
  • Town of Savoy
  • Resident Engineer: Michael Dostal
    Construction Contract Value: $5,859,836.00
    Construction Bid Price: $5,326,669.00
    Initial Construction Estimate: $6,245,015.50
    District: District 1

    Contracts (1) Progress
    # 71083 -- Construction Contract
    Emergency Roadway Stabilization on Route 2. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 10/13/2011
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Non Federal Aid
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 09/15/2011
    Project Initiation Form PIF Entered 09/20/2011
    Project Initiation Form PRC Submitted 09/21/2011
    Project Review Committee PRC Approved 09/26/2011
    Project Status Advertised 09/24/2011
    Project Management
    Final Design PS&E Received 09/27/2011
    Final Design PS&E to FAPRO 09/28/2011