Project Description: |
SUTTON- BRIDGE REPLACEMENT, S-33-005, BLACKSTONE STREET OVER BLACKSTONE RIVER
Municipal NBI; SD (6-4-5); AASHTO=48; POSTED (16-25-36); Bridge S-33-005 is a two span continuous reinforced concrete Tee beam bridge that was built in 1938. There are 4 beams/3 bays. The beams are rated a 4 and require Special member inspections.
|
Location: |
|
Construction Begins: | Winter 2017/2018 |
Resident Engineer: | Scott Fitzgerald |
Construction Bid Price: | $3,057,521.00 |
District: | District 3 |
|