Project Description: |
AYER- RESURFACING & RELATED WORK ON ROUTE 2A (FITCHBURG ROAD & PARK STREET)
The project extends from the Shirley Town line to Brook Street, a distance of 1.5 miles. The proposed improvements include resurfacing with minor widening, minor geometric improvements signal improvements at the intersection of Route 2A and Groton School Road, reconstruction of existing sidewalk and construction of new sidewalks, and improvements to drainage system to improve stormwater quality.
|
Location: |
|
Design Responsibility: | Municipality |
Right of Way Responsibility: | Municipality |
Project Manager: | Michael P Murphy![]() |
Estimated Total Contract Cost: | $2,200,000.00 |
Estimated Total Federal Participating Construction Cost: | $2,400,000.00 |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|