Project Description:
HOLYOKE- WEST SPRINGFIELD- IMPROVEMENTS & RELATED WORK ON I-91/ROUTE 5/I-90 CONNECTOR ROAD
The project consists of roadway resurfacing and minor widening on the I-91/Rte 5/I-90 Interchange in West Springfield. The project begins at the ends of the ramps connecting I-91NB & SB at Interchange #14 and extends to the ends of the ramps connecting to the RTE-5 NB & SB travel lanes. The total length of the Project is 0.75 miles, involving 2 miles of individual ramp roadways. The project shall not include any bridge work or I-90 interchange ramp work within the project limits. The work shall consist of 2,000 feet of box-widening to allow separate ramp lanes where a merge is currently required between the I-91 northbound and southbound off-ramps at Interchange #14, replacing the median single-face W beam with double-face thrie beam guardrail, and placing HMA pavement in accordance with Section 450 Quality Assurance Specifications for HMA Pavements and Section 455 Superpave HMA Specifications. Overhead guide sign installation for NB & SB travel lanes. The work also includes the following: pavement milling and resurfacing with hot mix asphalt, curb edging removal, installing type-a bituminous curb, installing painted pavement markings, installing reflectorized slotted pavement markers, w-beam guardrail removal, installing double-face thrie-beam, hook lock grate installation, traffic controls and erosion/sedimentation control measures. The milling and paving operations shall be coordinated to pave and mill in each work shift.
Location:
  • City of Holyoke
  • Town of West Springfield
  • Resident Engineer: Michael DeSimone
    Construction Contract Value: $1,686,797.00
    Construction Bid Price: $1,487,551.40
    Initial Construction Estimate: $1,182,877.50
    District: District 2

    Contracts (1) Progress
    # 77146 -- Construction Contract
    Roadway Reconstruction and Related Work on Ramps Connecting Interstate 90, 91 and Route 5. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 08/16/2013
    Contract Information
    Project Designer: In-House Boston
    Funding Source: Surface Trans. Program
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/10/2011
    Project Initiation Form PIF Entered 11/10/2011
    Project Initiation Form PRC Submitted 11/14/2011
    Project Review Committee PRC Approved 11/17/2011
    Project Status Advertised 04/06/2013
    Project Management
    100% Design 100% Package Received 01/28/2013
    100% Design 100% Package Comments to DE 03/06/2013
    25% Design 25% Package Received 03/01/2012
    75% Design 75% Package Received 03/01/2012
    75% Design 75% Package Comments to DE 05/10/2012
    75% Design 75% Plans Approved 01/08/2013
    75% Design 75% Plans Approved 01/09/2013
    75% Design 75% Plans Complete 03/01/2012
    Final Design PS&E Received 03/19/2013
    Final Design PS&E to FAPRO 03/26/2013