Project Description:
BOSTON- SOMERVILLE- CONDUIT SUPPORT REPLACEMENT & FIRE PROTECTION STANDPIPE MODIFICATION ALONG I-93 VIADUCT (CRC 18)
The contract is for the removal and replacement of an existing conduit support system. The existing system has been problematic and this contract will replace the system outright. The project also includes Fire Protection Standpipe modifications (Phase 1), complete removal of existing standpipe system and installation of Ph-1 Dry Standpipe System between bent 33 and Pier SB1 (at Temple Street), appr. distance of 1.81 miles.
Location:
  • City of Boston
  • City of Somerville
  • Resident Engineer: John Wagner
    Construction Contract Value: $10,636,446.19
    Construction Bid Price: $8,758,388.00
    Initial Construction Estimate: $10,555,000.00
    District: District 6

    Contracts (2) Progress
    # 77870 -- Design -- Hwy Eng Open End
    Master Service Agreement for statewide design and review services. Final
    # 85378 -- Construction Contract
    Relocation of Suspended Conduit to Below Grade and Standpipe Replacement (Phase 1) along a Section of Interstate 93 Viaduct. Completed

    Bridges

    Contract Dates
    Notice to Proceed: 06/26/2015
    Contract Information
    Project Designer: Consultant
    Funding Source: Metropolitan Highway System
    See the Milestone Details tab for additional Project information
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/14/2011
    Project Initiation Form PIF Entered 11/14/2011
    Project Initiation Form PRC Submitted 11/14/2011
    Project Review Committee PRC Approved 11/17/2011
    Project Status Advertised 10/18/2014
    Project Management
    100% Design 100% Package Received 08/06/2014
    100% Design 100% Package Comments to DE 09/02/2014
    25% Design 25% Package Received 06/03/2013
    25% Design 25% Package Comments to DE 07/05/2013
    75% Design 75% Package Received 02/24/2014
    75% Design 75% Package Comments to DE 04/08/2014
    Final Design PS&E Received 10/03/2014
    Final Design PS&E Received 01/21/2015
    Final Design PS&E to FAPRO 10/14/2014
    Final Design PS&E to FAPRO 01/21/2015