Project Description:
BOSTON TO CHELSEA- TOBIN BRIDGE TOLL PLAZA REPLACEMENT WITH ALL ELECTRONIC TOLLING (AET)
This project will replace the toll plaza located on the center span of the Tobin Bridge (Rte 1 Southbound) with an All Electronic Tolling (AET) system to be installed on the Boston end of the bridge exiting the CANA tunnel.
Location:
  • City of Boston
  • City of Chelsea
  • Resident Engineer: Joseph Graham
    Construction Contract Value: $2,470,459.98
    Construction Bid Price: $2,079,356.50
    Initial Construction Estimate: $1,902,517.72
    District: District 6

    Contracts (1) Progress
    # 68356 -- Construction Contract
    Installation of All Electronic Toll Collection (AETC) - Ramp T-L and Connector T-C of Route 1 Southbound. Completed

    Bridges

  • - none -
  • Contract Dates
    Notice to Proceed: 04/26/2013
    Contract Information
    Project Designer: Consultant
    Funding Source: Tobin
    See the Milestone Details tab for additional Project information
    Initiation
    no comments
    Scoping
    no comments
    Property Impacts - Right of Way
    no comments
    Environmental Impacts
    no comments
    Project Design
    no comments
    Project Funding
    no comments
    Public Involvement
    no comments
    Construction
    no comments
    Accelerated Bridge Program
    no comments
    No TIP Data Available For This Project
    Project Task Information
    Project Status
    Project Need Form PNF Entered 11/15/2011
    Project Initiation Form PIF Entered 11/15/2011
    Project Initiation Form PRC Submitted 11/15/2011
    Project Review Committee PRC Approved 11/17/2011
    Project Status Advertised 02/02/2013
    Project Management
    100% Design 100% Package Received 04/10/2012
    75% Design 75% Package Received 03/12/2012
    Final Design PS&E Received 03/01/2013
    Final Design PS&E to FAPRO 05/01/2012