| Project Description: |
BOSTON TO CHELSEA- TOBIN BRIDGE TOLL PLAZA REPLACEMENT WITH ALL ELECTRONIC TOLLING (AET)
This project will replace the toll plaza located on the center span of the Tobin Bridge (Rte 1 Southbound) with an All Electronic Tolling (AET) system to be installed on the Boston end of the bridge exiting the CANA tunnel.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Michelle Boucher![]() |
| Estimated Total Contract Cost: | $2,470,459.98 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|