Project Description: |
BOSTON TO CHELSEA- TOBIN BRIDGE TOLL PLAZA REPLACEMENT WITH ALL ELECTRONIC TOLLING (AET)
This project will replace the toll plaza located on the center span of the Tobin Bridge (Rte 1 Southbound) with an All Electronic Tolling (AET) system to be installed on the Boston end of the bridge exiting the CANA tunnel.
|
Location: |
|
Resident Engineer: | Joseph Graham |
Construction Contract Value: | $2,470,459.98 |
Construction Bid Price: | $2,079,356.50 |
Initial Construction Estimate: | $1,902,517.72 |
District: | District 6 |
|
Bridges |
|
|
|
|