| Project Description: |
BOSTON TO CHELSEA- TOBIN BRIDGE TOLL PLAZA REPLACEMENT WITH ALL ELECTRONIC TOLLING (AET)
This project will replace the toll plaza located on the center span of the Tobin Bridge (Rte 1 Southbound) with an All Electronic Tolling (AET) system to be installed on the Boston end of the bridge exiting the CANA tunnel.
|
| Location: |
|
| Resident Engineer: | Joseph Graham![]() |
| Construction Contract Value: | $2,470,459.98 |
| Construction Bid Price: | $2,079,356.50 |
| Initial Construction Estimate: | $1,902,517.72 |
| District: | District 6 |
|