Project Description: |
AMESBURY- POWWOW RIVERWALK CONSTRUCTION AT WATER STREET
(Replaces #602343) The project involves the construction of a bicycle and pedestrian pathway along Water Street, continuing 660 feet along the Back River and Powwow River.
|
Location: |
|
Construction Begins: | Summer 2018 |
Resident Engineer: | Raymond Orsini |
Construction Bid Price: | $575,422.00 |
District: | District 4 |
|
Bridges |
|
|
|
|