BRIMFIELD- PALMER- WARREN- RESURFACING & RELATED WORK & STORMWATER IMPROVEMENTS ON SECTIONS OF I-90 (BETWEEN MM 61.4 & MM 69.6) (8.2 MILES)
The work shall consist of milling and resurfacing travel lanes at deteriorated sections of Route I-90 between MM 61.4 and MM 69.6. The work includes installing painted pavement markings, installing reflectorized slotted pavement markers, traffic controls and erosion/sedimentation control measures. The milling and paving operations shall be coordinated to pave and mill in each work shift
|