| Project Description: |
CONWAY- RETAINING WALL REPLACEMENT ON ROUTE 116 ALONG THE SOUTH RIVER
(Replaces #80822) The existing retaining wall along Route 116 and the South River in Conway will be replaced. The new wall will be constructed within the same footprint of the existing wall.
|
| Location: |
|
| Resident Engineer: | Michael Dostal![]() |
| Construction Contract Value: | $3,417,763.20 |
| Construction Bid Price: | $3,169,694.00 |
| Initial Construction Estimate: | $4,471,789.50 |
| District: | District 1 |
|
Bridges |
||||||||||||||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||||||||||||||