| Project Description: |
AUBURN TO BOSTON- GUIDE & TRAFFIC SIGN REPLACEMENT ON A SECTION OF I-90 (MASSPIKE)
Work consists of replacing traffic signs on Interstate 90 (MassPike) between Interchange 10 in Auburn and Interchange 20 in Boston.
|
| Location: |
|
| Construction Begins: | Spring 2016 |
| Resident Engineer: | Eric Mistretta![]() |
| Construction Bid Price: | $5,206,453.45 |
| District: | District 6 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||||||||