| Project Description: |
LAKEVILLE- RECONSTRUCTION AND RELATED WORK ON RHODE ISLAND ROAD (ROUTE 79), FROM THE TAUNTON CITY LINE TO CLEAR POND ROAD
Work on this project consists of corridor improvements along Route 79 including bicycle lanes, a sidewalk, drainage upgrades and intersection improvements - specifically at the Route 79/Route 18 intersection and the Route 79/Precinct Street intersection. The roadway will be milled and overlaid with box cut widening proposed.
|
| Location: |
|
| Construction Begins: | Autumn 2025 |
| Resident Engineer: | Alfredo Nunez![]() |
| Construction Bid Price: | $17,385,000.00 |
| Funding Provision: | This project is planned to be funded through the 2026 Transportation Improvement Program for the Southeastern Massachusetts Metropolitan Planning Organization. |
| District: | District 5 |
| Current Status: | • Environmental walk was done on 4/8/26. • Advanced warning signs were installed on 4/9/26. • Clearing and tree removal started on 4/20/26. • Installation of erosion control began 5/12/26, now complete. • Saw cutting for drainage ongoing. • Drainage construction started on 5/26/26. Normal work hours are Monday through Friday, 7:00 AM to 3:30 PM (as of 06/01/2026) |
|
Bridges |
||||||||
|
||||||||||
|
|
|||||||||||||||||||||||||||||||||||||||||
|
||||||||||||||||||||||||||||||||||||||||||||||||||