Project Description: |
HOLDEN- BRIDGE REPLACEMENT, H-18-008, ROUTE 31 (WACHUSETT STREET) OVER THE QUINAPOXET RIVER
The existing bridge will be replaced with a new single span bridge, along with new roadway approaches, guardrail, sidewalk and slope treatment. The bridge will be open during the proposed staged construction.
|
Location: |
|
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Morteza Tayarani![]() |
Estimated Total Contract Cost: | $2,480,278.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 3 |
Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
|
|
|