| Project Description: |
HOLDEN- BRIDGE REPLACEMENT, H-18-008, ROUTE 31 (WACHUSETT STREET) OVER THE QUINAPOXET RIVER
The existing bridge will be replaced with a new single span bridge, along with new roadway approaches, guardrail, sidewalk and slope treatment. The bridge will be open during the proposed staged construction.
|
| Location: |
|
| Resident Engineer: | Byron Beauregard![]() |
| Construction Contract Value: | $2,480,278.00 |
| Construction Bid Price: | $1,980,241.88 |
| Initial Construction Estimate: | $2,571,035.30 |
| District: | District 3 |
|