HOLDEN- BRIDGE REPLACEMENT, H-18-008, ROUTE 31 (WACHUSETT STREET) OVER THE QUINAPOXET RIVER
The existing bridge will be replaced with a new single span bridge, along with new roadway approaches, guardrail, sidewalk and slope treatment. The bridge will be open during the proposed staged construction.
Location:
  • Town of Holden
  • Design Responsibility: Consultant
    Right of Way Responsibility: MassDOT
    Project Manager: Morteza Tayarani
    Estimated Total Contract Cost: $2,480,278.00
    Estimated Total Federal Participating Construction Cost: N/A
    District: District 3
    Current Status: This project is in the preliminary design phase.

    Contracts (0) Progress
    No contracts associated with this project

    Bridges

    • H18008 
    See the Milestone Details tab for additional Project information