Project Description: |
DISTRICT 6- WATER INFILTRATION STUDY ON EPOXY HANGER ANCHORAGES AT REDLINE UNDERPINNING IN I-93 TUNNEL (NB)
Study/Investigation of leak impact on the integrity of the epoxy anchors at redline underpinning.
|
Location: | |
Design Responsibility: | Consultant |
Right of Way Responsibility: | MassDOT |
Project Manager: | Thomas P Donald |
Estimated Total Contract Cost: | $115,000.00 |
Estimated Total Federal Participating Construction Cost: | N/A |
District: | District 6 |
Current Status: | This project is in the preliminary design phase. |
|