| Project Description: |
BOSTON- BRIDGE REHABILITATION, B-16-058 & B-16-059, MARKET STREET, OVER I-90 & MBTA/CSX & EVERETT STREET, OVER COMBINED LINCOLN STREET, I-90, CSX, MBTA & BRAINTREE STREET
Replace deck joints, bearing devices, repair & paint steel superstructure, rehab substructure.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Hema P Bhatt![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 6 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges
|
||||||
|
|
|
||