| Project Description: |
BRIDGEWATER- BROCKTON- WEST BRIDGEWATER- INSTALLATION OF AN ANTI-GLARE SCREEN ALONG ROUTE 24 MEDIAN
Work on this project consists of installing an anti-glare screen on the median barrier to reduce vehicular headlight glare.
|
| Location: |
|
| Design Responsibility: | In-House Boston |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | Albert Li![]() |
| Estimated Total Contract Cost: | $1,135,288.00 |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 5 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||