| Project Description: |
CHICOPEE- SLOPE PROTECTION IMPROVEMENTS AT I-391 BRIDGE OVER THE CONNECTICUT RIVER
Project consists of the construction of slope protection along the easterly bank of the Connecticut River under the I-391 Bridge. Work at this location will include the placement of Geotextile filter fabric, crushed stone and articulated concrete blocks with galvanized revetment cables.
|
| Location: |
|
| Construction Begins: | Spring 2019 |
| Resident Engineer: | Jessica Gaudet![]() |
| Construction Bid Price: | $459,981.00 |
| District: | District 2 |
|
Bridges |
||||||||
|
||||||||||
|
|
|
||||||||||||||||||||||||||||||||