Project Description: |
CHICOPEE- SLOPE PROTECTION IMPROVEMENTS AT I-391 BRIDGE OVER THE CONNECTICUT RIVER
Project consists of the construction of slope protection along the easterly bank of the Connecticut River under the I-391 Bridge. Work at this location will include the placement of Geotextile filter fabric, crushed stone and articulated concrete blocks with galvanized revetment cables.
|
Location: |
|
Construction Begins: | Spring 2019 |
Resident Engineer: | Jessica Gaudet |
Construction Bid Price: | $459,981.00 |
District: | District 2 |
|
Bridges |
|
|
|
|