| Project Description: |
CHICOPEE- SLOPE PROTECTION IMPROVEMENTS AT I-391 BRIDGE OVER THE CONNECTICUT RIVER
Project consists of the construction of slope protection along the easterly bank of the Connecticut River under the I-391 Bridge. Work at this location will include the placement of Geotextile filter fabric, crushed stone and articulated concrete blocks with galvanized revetment cables.
|
| Location: |
|
| Design Responsibility: | Consultant |
| Right of Way Responsibility: | MassDOT |
| Project Manager: | M. Ali Jalinous![]() |
| Estimated Total Federal Participating Construction Cost: | N/A |
| District: | District 2 |
| Current Status: | This project is in the preliminary design phase. |
|
Bridges |
||||||
|
|
|
||